“We have seen lasting results in the processes and procedures Lee help guide us through for our warehouse logistics.” View Full Testimonial |
Free Subscription
Join our mailing list to receive our Keys to Profitability Newsletter.
Subscribe Now
Join our mailing list to receive our Keys to Profitability Newsletter.
Subscribe Now
Case Studies
Here is just a small sampling of how the Schwartz Profitability Group delivers results, helping clients improve operational efficiencies and successfully achieving their objectives.
Manufacturing Case Studies | Distribution Case Studies |
Time to Upgrade? ERP Selection and Implementation
– International Skin Care Manufacturer
PROBLEM | Company is overwhelmed by spreadsheets, shackled by time-consuming inventory management systems and operational processes. |
SOLUTION | SPG engaged to thoroughly assess existing operations and make recommendations. Comprehensive report strongly advises implementation of a fully functioning, integrated ERP/ MRP system. |
RESULTS | SPG leads client through software selection. Implementation is due to begin shortly. (For more details . . .) |
Daily Errors Eradicated in 3 Weeks –
International Manufacturer of Skin Care/ Home & Garden Products
PROBLEM | Recently installed software not working correctly per client, not being used properly per the VAR. Client is ready to scuttle the project after spending tens of thousands of dollars. |
SOLUTION | After in-depth evaluation, garbage data trashed, then thoroughly updated. Software modifications implemented. Unproductive operational practices replaced with best practice procedures. |
RESULTS | Within three weeks daily errors and work-flow disruption eradicated. Software working to everyone’s satisfaction. (For more details . . .) |
Facility Consolidation. Make sense?
– International Electronics Manufacturer
PROBLEM | Forty miles separate two buildings used for inventory storage and assembly. New building is indentified to possibly consolidate operations. Pull the trigger? |
SOLUTION | SPG engaged to conduct comprehensive Feasibility Study to evaluate storage space requirements projecting five years into the future. |
RESULTS | Proposed building not sufficient to meet client needs. Study prevents client from making a damaging and expensive decision. (For more details . . .) |
75% Growth – No Increase in Staff
– International Manufacturer
PROBLEM | Batch printing of nine-part shipping/ invoice forms. Wasting paper. Bottleneck of effort and activity. |
SOLUTION | Placed separate printers on shop floor. Installed freight software. Upgraded accounting software. Integrated all systems. |
RESULTS | Saved tens of thousands of dollars by eliminating five parts. Continuous flow of order fulfillment. Business grew 75% with no staff growth. |
Labor Costs Cut by 17%
– Multi-Location Specialty Distributor
PROBLEM | Poor on-time performance (60-70%) of receiving and shipping in multi-location environment. |
SOLUTION | Implemented tighter operational controls and procedures. Established KPIs and benchmarking measurements. |
RESULTS | On-time performance jumped over 95% in less than six weeks. Reduced temporary staffing by over 80%. Decreased total labor costs by approximately 17%. |
Transportation Costs Cut by 30%
– International Hardware Company
PROBLEM | Outbound freight costs too high. |
SOLUTION | Audited outbound activity and charges. Negotiated with carriers on behalf of client for better rates. |
RESULTS | Client saved over 30% on outbound LTL (less than truckload) costs. |
Doubled Output in 40% Less Time
– National Sporting Goods Distributor/ Retailer
PROBLEM | 40,000 sq. ft. warehouse bursting at the seams. Paper based order picking systems requires days to complete with pallets stacked in almost every aisle. |
SOLUTION | New distribution center purchased. SPG engaged to design the new warehouse plus implement a best-in-breed ERP/ WMS system. Procedures completely revamped. |
RESULTS | Client went live in only 3-1/2 months, completely moved in with all systems go. Able to maintain pre-go-live staff levels while doubling output in 40% less time. Saved AT LEAST $200,000 in annual labor costs. (For more details . . .) |
Inventory Sprouting Legs and Walking?
– Hand Tool Distributor
PROBLEM | Distributor believes the company is the victim of inventory theft. |
SOLUTION | SPG conducts an intensive observation of warehouse practices and interviews staff. Theft not the issue. Indentifies need for new procedures and necessity for hiring more skilled management. |
RESULTS | With SPG’s assistance, more qualified warehouse manager hired. Inventory management best practices are being implemented. (For more details . . .) |
Poor Practices Impact Productivity
– Lighting and Energy Service Company
PROBLEM | Operational and sales procedures are highly inefficient. Processes are neither repeatable nor consistent. Ownership is convinced that poor practices are undermining opportunities and profitability. |
SOLUTION | With contribution from client staff, SPG evaluates as-is state, identifies future-state procedures, then maps and thoroughly documents the steps necessary to achieve future-state processes. |
RESULTS | Wasteful steps have been eliminated. Existing systems are better utilized. Documented procedures in place are efficient, repeatable and fully memorialized. (For more details . . .) |